aaron thomas plumbing logo
aaron thomas plumbing logo

Bathroom refurbishment

This bathroom involved the installation of a macerator in the garage below to allow for the waste to be pumped up over the property through the roof space and into the soil pipe to be taken to the drains. The main reason for installing this unit over a conventional macerator was to allow the shower unit to sit at floor level without a plinth, and increasing space by not installing a false wall to hide the macerator and pipework.


The floor was installed with electric underfloor heating and finished with tiles featuring a short wall upstand.


The walls were painted with tiling around the walk-in shower and basin splash back.

Print Print | Sitemap Recommend this page Recommend this page
Copyright Aaron Thomas Plumbing